Demolition

Camp Blanding: Remedial Action of Landfill 8

Fort Benning, GA

The project scope included Design/ Build effort under contract with the Savannah District Army Corps of Engineers. The landfill was subject to severe slope stability problems. Waste previously was placed on very steep slopes, and several failure escarpments had occurred. The construction activities consisted of the necessary earthwork to properly manage stormwater, minimize erosion and stabilize the slopes, backfilling, berm construction and installation of stormwater diversion swales/spillways as well as reshaping to detain stormwater and direct the water away from the steeper slopes.

Value: $750,000

Ready to start your project?

Contact us to get started today!